Barriers to Implementing ADR Mechanisms in the Construction Industry: A DEMATEL–ISM–MICMAC Analysis
Identification
- Public canonical key
- radar:r-4bdccafc8410224d6266cc874f0ce8d4
- Authors
- Xuan Xie · Yuchun Tang · Qi Li · Guanqiao Zhang · Shaowei Tian
- Reported year
- 2026
- Reported language
- en
- Source type
- article
- First detected
- 2026-11-14T02:46:47.947602+00:00
- Last metadata observation
- 2026-11-14T02:46:47.947602+00:00
- Last HTTP verification
- Not checked
Institutions reported by the source
Jilin Jianzhu University · National University of Singapore · Akademia Śląska · Changchun Institute of Technology · Dongbei University of Finance and Economics · Hainan University
Reported affiliation countries
CN · PL · SG
Documentary abstract — original language
Abstract Alternative dispute resolution (ADR) mechanisms are considered to offer several advantages over litigation and arbitration, including greater flexibility, lower cost, and better preservation of cooperative relationships between disputing parties. However, they have not been widely adopted in China’s construction industry. This study aims to identify the barriers to the implementation of ADR mechanisms for dispute resolution in the Chinese construction industry. First, 15 barrier factors were identified through a literature review and expert interviews. Then, the integrated Decision Making Trial and Evaluation Laboratory-Interpretive Structural Modeling-Cross Impact Matrix Multiplication Applied to Classification (DEMATEL-ISM-MICMAC) approach was employed to analyze the interrelationships among these factors and to develop a multilevel hierarchical structural model of the barriers to implementing ADR mechanisms for dispute resolution in China’s construction industry, thereby identifying the most fundamental barriers. The results were further validated based on the driving power and dependence of the barrier factors. The findings indicate that the lack of supporting laws and regulations is the most fundamental barrier to the implementation of ADR mechanisms in China’s construction industry. The absence of explicit ADR provisions in contracts and the low willingness to use ADR mechanisms are identified as direct barriers. The results are of great significance for enriching the body of knowledge on ADR mechanisms and promoting their global development. They also provide useful references for the promotion of ADR mechanisms in China and in other countries and regions where ADR is still at an early stage of development.
Identifiers
- OPENALEX
- https://openalex.org/W7223173532
- DOI
- 10.1061/jladah.ladr-1708
Documentary context
- Documentary family
- article
- Source-reported types
- article
- Publishers
- American Society of Civil Engineers
Entity mentions are not evidence of legal recognition. Jurisdiction studied is separate from author affiliation country.
Sources
OpenAlex · Record 1
Cite this reference
Xuan Xie; Yuchun Tang; Qi Li; Guanqiao Zhang; Shaowei Tian. Barriers to Implementing ADR Mechanisms in the Construction Industry: A DEMATEL–ISM–MICMAC Analysis. 2026. https://doi.org/10.1061/jladah.ladr-1708
JSON · CSL-JSON · BibTeX · RIS · CSV · JSON-LD ·
APA, Chicago, ISO 690: bibliographic formats using available fields. OSCOLA / Bluebook: structured data only; full legal citation compliance is not claimed without verification of required elements.
- APA
- Xuan Xie; Yuchun Tang; Qi Li; Guanqiao Zhang; Shaowei Tian. (2026). Barriers to Implementing ADR Mechanisms in the Construction Industry: A DEMATEL–ISM–MICMAC Analysis. https://doi.org/10.1061/jladah.ladr-1708
- Chicago
- Xuan Xie; Yuchun Tang; Qi Li; Guanqiao Zhang; Shaowei Tian. Barriers to Implementing ADR Mechanisms in the Construction Industry: A DEMATEL–ISM–MICMAC Analysis. 2026. https://doi.org/10.1061/jladah.ladr-1708
- ISO 690
- Xuan Xie; Yuchun Tang; Qi Li; Guanqiao Zhang; Shaowei Tian. Barriers to Implementing ADR Mechanisms in the Construction Industry: A DEMATEL–ISM–MICMAC Analysis. 2026. https://doi.org/10.1061/jladah.ladr-1708
Warning: Undefined array key "last_link_verified" in /home/clients/e27d81e12f04d2bfd747aa264540ac56/sites/_UDTR_APP/legal_library_reference.php on line 31
UDTR Global Rights of Nature Legal Library. Barriers to Implementing ADR Mechanisms in the Construction Industry: A DEMATEL–ISM–MICMAC Analysis. Documentary record: https://www.declarationuniverselledesdroitsdelarbre.org/global-rights-of-nature-radar/reference/r-4bdccafc8410224d6266cc874f0ce8d4/ · Last HTTP verification: not performed
Research dossiers and documentary relations
Source roles
Bibliographic / original publication source · https://doi.org/10.1061/jladah.ladr-1708
An authority link alone does not verify a legal claim. Abstracts and full texts remain subject to their source terms.
Documentary status
Relevance pending
Library
This identity is not yet included in the Legal Library.