UDTR Global Radar

UDTR Global Rights of Nature Radar

Documentary registry of records detected across the scholarly, legal and institutional infrastructures monitored by UDTR.

A global documentary infrastructure designed to achieve the broadest verifiable and scientifically defensible coverage of the Rights of Nature.

← Back to Radar

Konsekwencje ustalenia wynagrodzenia dla wykonawcy zamówienia publicznego w formie niepieniężnej

Identification

Public canonical key
radar:r-2a095a2a1f726598354c751379f838ef
Authors
Adam Mika
Reported year
2026
Reported language
pl
Source type
article
First detected
2026-11-13T09:03:22.377279+00:00
Last metadata observation
2026-11-13T09:03:22.377279+00:00
Last HTTP verification
Not checked

Documentary abstract — original language

One of the indispensable elements of a public procurement contract is its remuneration. However, the legislator does not pay too much attention to the issue of the variety of forms of remuneration for the contractor. This raises the question of the admissibility of unconventional solutions in this area and of agreeing on remuneration, e.g. in the form of a benefit in kind. The central point of consideration in this article are the legal consequences related to the selection of non-cash remuneration for the public procurement contractor.

Identifiers

OPENALEX
https://openalex.org/W7222986648
DOI
10.19195/0524-4544.339.5

Documentary context

Documentary family
article
Source-reported types
article
Publishers
Wrocław University Press

Entity mentions are not evidence of legal recognition. Jurisdiction studied is separate from author affiliation country.

Sources

OpenAlex · Record 1

Cite this reference

Adam Mika. Konsekwencje ustalenia wynagrodzenia dla wykonawcy zamówienia publicznego w formie niepieniężnej. 2026. https://doi.org/10.19195/0524-4544.339.5

JSON · CSL-JSON · BibTeX · RIS · CSV · JSON-LD ·

APA, Chicago, ISO 690: bibliographic formats using available fields. OSCOLA / Bluebook: structured data only; full legal citation compliance is not claimed without verification of required elements.

APA
Adam Mika. (2026). Konsekwencje ustalenia wynagrodzenia dla wykonawcy zamówienia publicznego w formie niepieniężnej. https://doi.org/10.19195/0524-4544.339.5
Chicago
Adam Mika. Konsekwencje ustalenia wynagrodzenia dla wykonawcy zamówienia publicznego w formie niepieniężnej. 2026. https://doi.org/10.19195/0524-4544.339.5
ISO 690
Adam Mika. Konsekwencje ustalenia wynagrodzenia dla wykonawcy zamówienia publicznego w formie niepieniężnej. 2026. https://doi.org/10.19195/0524-4544.339.5

Warning: Undefined array key "last_link_verified" in /home/clients/e27d81e12f04d2bfd747aa264540ac56/sites/_UDTR_APP/legal_library_reference.php on line 31

UDTR Global Rights of Nature Legal Library. Konsekwencje ustalenia wynagrodzenia dla wykonawcy zamówienia publicznego w formie niepieniężnej. Documentary record: https://www.declarationuniverselledesdroitsdelarbre.org/global-rights-of-nature-radar/reference/r-2a095a2a1f726598354c751379f838ef/ · Last HTTP verification: not performed

Report a correction

Frozen-version metadata

Research dossiers and documentary relations

Source roles

Bibliographic / original publication source · https://doi.org/10.19195/0524-4544.339.5

An authority link alone does not verify a legal claim. Abstracts and full texts remain subject to their source terms.

Documentary status

Relevance pending

Library

This identity is not yet included in the Legal Library.

UDTR Global Rights of Nature Legal Library