Knowledge-driven smart construction cost management: an agent-based modelling approach in Ningbo City
Identification
- Public canonical key
- radar:r-192e7bd91f07b7b2a442d6ba77d23acc
- Authors
- Jingxiao Zhang · Fangyu Dong · Xin Liu · Martin Skitmore · Pablo Ballesteros‐Pérez
- Reported year
- 2026
- Reported language
- en
- Source type
- article
- First detected
- 2026-11-14T02:47:54.687509+00:00
- Last metadata observation
- 2026-11-14T02:47:54.687509+00:00
- Last HTTP verification
- Not checked
Institutions reported by the source
Chang'an University · Bond University · Universitat Politècnica de València
Reported affiliation countries
AU · CN · ES
Documentary abstract — original language
The rapid integration of cloud computing, artificial intelligence, 5 G and the Internet of Things has accelerated the adoption of smart technologies across industries. Despite its substantial contribution to national economies, limited informatization continues to generate challenges in safety, efficiency and cost management in the construction sector. And existing studies lacked a deep analysis of the mechanisms through which informatization impacts project costs. This study adopts a knowledge-driven perspective to reveal the mechanism of cost management in smart site This study and presents an Agent-Based Modelling (ABM) approach to address the limitations of traditional project management in smart site construction. By redefining production, cost and benefit functions, the ABM model simulates the effects of policy interventions, pricing rule adjustments and the application of smart functions on project costs. Field investigations of 12 smart site projects in Ningbo City, combined with simulation modelling, demonstrate the significant influence of smart site informatization on project costs and economic outcomes. Results identify an optimal level of smart function application and elucidate the interactions between human capital investment, informatization supervision and technology system application. The ABM model can capture dynamic processes that traditional static models or econometric models cannot represent. Strategic recommendations are provided to guide the development of construction informatization, optimize government incentives and enhance information technology innovation. The findings offer actionable insights for cost-effective smart site project management, advancing knowledge on integrating intelligent technologies in construction; and supporting the broader goal of sustainable, information-driven project delivery.
Identifiers
- OPENALEX
- https://openalex.org/W7135085094
- DOI
- 10.1080/15623599.2026.2641180
Documentary context
- Documentary family
- article
- Source-reported types
- article
- Publishers
- Taylor & Francis
Entity mentions are not evidence of legal recognition. Jurisdiction studied is separate from author affiliation country.
Sources
OpenAlex · Record 1
Cite this reference
Jingxiao Zhang; Fangyu Dong; Xin Liu; Martin Skitmore; Pablo Ballesteros‐Pérez. Knowledge-driven smart construction cost management: an agent-based modelling approach in Ningbo City. 2026. https://doi.org/10.1080/15623599.2026.2641180
JSON · CSL-JSON · BibTeX · RIS · CSV · JSON-LD ·
APA, Chicago, ISO 690: bibliographic formats using available fields. OSCOLA / Bluebook: structured data only; full legal citation compliance is not claimed without verification of required elements.
- APA
- Jingxiao Zhang; Fangyu Dong; Xin Liu; Martin Skitmore; Pablo Ballesteros‐Pérez. (2026). Knowledge-driven smart construction cost management: an agent-based modelling approach in Ningbo City. https://doi.org/10.1080/15623599.2026.2641180
- Chicago
- Jingxiao Zhang; Fangyu Dong; Xin Liu; Martin Skitmore; Pablo Ballesteros‐Pérez. Knowledge-driven smart construction cost management: an agent-based modelling approach in Ningbo City. 2026. https://doi.org/10.1080/15623599.2026.2641180
- ISO 690
- Jingxiao Zhang; Fangyu Dong; Xin Liu; Martin Skitmore; Pablo Ballesteros‐Pérez. Knowledge-driven smart construction cost management: an agent-based modelling approach in Ningbo City. 2026. https://doi.org/10.1080/15623599.2026.2641180
Warning: Undefined array key "last_link_verified" in /home/clients/e27d81e12f04d2bfd747aa264540ac56/sites/_UDTR_APP/legal_library_reference.php on line 31
UDTR Global Rights of Nature Legal Library. Knowledge-driven smart construction cost management: an agent-based modelling approach in Ningbo City. Documentary record: https://www.declarationuniverselledesdroitsdelarbre.org/global-rights-of-nature-radar/reference/r-192e7bd91f07b7b2a442d6ba77d23acc/ · Last HTTP verification: not performed
Research dossiers and documentary relations
Source roles
Bibliographic / original publication source · https://doi.org/10.1080/15623599.2026.2641180
An authority link alone does not verify a legal claim. Abstracts and full texts remain subject to their source terms.
Documentary status
Relevance pending
Library
This identity is not yet included in the Legal Library.